Project Name
New Wastewater Treatment Plant
Location
Londonderry Township, PA
Project Description
The work for this project consisted of a new 1.5 million gallons per day (MGD) wastewater treatment plant; hydraulic grinder, pump station, headwork’s building with mechanical bar screen with grit and grease removal system, two (2) 120’ diameter aeration tanks, RAS pump station, two (2) 55’ diameter clarifiers, scum pump station, flocculation tank, filter building with 2 cloth disk filters and 3 UV reactors, various chemical feed systems, post aeration basin, various instrumentation equipment WAS holding tank with aeration system, dewatering building with solid bowl decanter centrifuge, polymer feed system, ammonia scrubber and lime silo with sludge conveyors.
Owner’s Name
North Londonderry Township Authority
Engineer
GHD