Coyler Lake Dam Rehabilitation 

Project Name

Coyler Lake Dam Rehabilitation

Location

Potter Township, PA

Project Description

Performance Construction Services was hired to complete the rehabilitation of this high visibility public project by providing the lowest responsible bid. Serving as the General Contractor and concrete contractor, Performance managed excavation, rock anchor, and utility slip-lining subcontracts. Complete demolition of the existing spillway and construction of the new 3800 CY cast-in-place concrete spillway is the only evidence that a construction project occurred on this site. Beneath the soils of the earthen embankment lays 11,000 CY of roller compacted concrete. The process took 2 months to complete, working evening/night hours due to temperature restrictions. This project marked Performance Construction Services’ second self-performed RCC project with the consultation of Gears, Inc.

Owner’s Name

Pennsylvania Department of General Services (Pennsylvania Fish & Boat Commission)

Engineer

Schnabel Engineering